Lesson 4 of 9About 4 minutesMegalug steps: lesson 6
1Prep & layout
2Stations
3Tie-in to the city main
4Detector check
5Bed & lay
6Fittings & restraint
7Fire riser
8Cover it right
9Flush & test
Watch
Buried in line, flanged ends
The steps
A detector check lets water go one way only, from the city main to the building. Set it backwards and the building gets no fire water. It has to be dug up and done over.
Know which way the water goes. From the city main, toward the building.
Find the arrow on the body before it goes in the ditch. Every detector check has one cast on it, whatever brand shows up.
Arrow points to the building. Never toward the main.
Look inside both ends. Clean, nothing in it, and the clapper swings free.
Set it level with the bypass meter on top.
Second man checks the arrow before the first bolt goes in.
MJ-by-flange adapter on each end. The check has flanged ends. Bolt the flange side of an adapter to each end of the check, flange gasket between, and bring the bolts up evenly, working across from each other. The MJ side of each adapter takes the pipe.
Make up the MJ side of each adapter the way Fittings & restraint (lesson 6) shows: clean, gland and gasket, seat it flush, T-bolts, even gap, every breaker head off.
Before it gets covered, take the photo: the arrow pointing to the building, both adapters bolted, both Megalugs done. No poly wrap on a detector check.
Your photo
In TJS Field
One photo of the detector check, before any dirt goes on it. It does not get poly wrap.
Open TJS Field.
Pick the job.
Tap the camera button, 📷 Take a photo, and take the picture.